Sign In | Join Free | My chinapackagenet.com
China Daoyunai Energy Saving Technology Limited logo
Daoyunai Energy Saving Technology Limited
Committed to underground pipeline CIPP and CCTV
Verified Supplier

4 Years

Home > CIPP Water Inversion >

Cured In Place Pipe CIPP Water Inversion Hot Water Cure Underground Pipes Repair NO Dig

Daoyunai Energy Saving Technology Limited
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Cured In Place Pipe CIPP Water Inversion Hot Water Cure Underground Pipes Repair NO Dig

Brand Name : DAO

Model Number : DN1800

Place of Origin : Jiangsu, China

MOQ : 68m

Price : Variable

Payment Terms : T/T

Supply Ability : 300km per year

Delivery Time : 15 workding days

Packaging Details : Variable

Material : Non-woven felts with resin

Structure : 6 layers

Diameter : DN1800

Thickness : 19mm

Color : Original

Length : 190m

Contact Now

Hot water cure and inversion material for underground pipes repair NO Digging

The hot water cure liner trenchless repair construction process is mainly divided into two parts: Material Factory fabrication and construction site inversion:

(1) Material factory fabrication

Factory fabrication of materials mainly includes three steps:

① Cut off the length of the hose according to the engineering design requirements, and calculate the quantity of resin and other materials;

② Fully vacuum the turnover soft cylinder, so that the resin can fully soak the felt layer;

③ Put the resin and curing agent into the mixing barrel according to a certain proportion for full mixing. After mixing them evenly, pour them into the turnover soft barrel, and evenly pour the resin into the soft barrel through the turnover pressing platform to form the turnover repair material;

2) Construction site inversion

Before inverting, it is necessary to ensure that the pipeline meets the conditions. Therefore, before inverting, the pipeline shall be blocked, drained, and dredged accordingly. If necessary, the internal part of the pipeline shall be treated (such as local deformation recovery), so as to ensure that the quality of the overturned lining meets the requirements.

Before the materials enter the site, a turnover platform shall be set up at the inversion wellhead.

(3) Heating

A hot water boiler is used to heat the flexible liner cylinder circularly. By continuously raising the temperature of the water in the pipeline, the resin will react. After reaching a certain temperature (about 85 ℃) for a certain time, the pipeline repair will be cured and completed.

(4) Tail end treatment

After the pipe is cooled, the excess part at the tail end of the pipe shall be cut off to keep it level with the pipe orifice. At the same time, the pipe interface shall be grouted to integrate the new pipe and the old pipe, so as to complete the CIPP lining repair of the pipe.

Function Underground pipe repair
Inversion Water
Cure Hot water
Diameters DN1800mm

Cured In Place Pipe CIPP Water Inversion Hot Water Cure Underground Pipes Repair NO Dig


Product Tags:

DAO Cured in Place Pipe CIPP Water Inversions

      

CIPP Water Inversion Hot water cure

      

DAO CIPP NO Digs

      
China Cured In Place Pipe CIPP Water Inversion Hot Water Cure Underground Pipes Repair NO Dig wholesale

Cured In Place Pipe CIPP Water Inversion Hot Water Cure Underground Pipes Repair NO Dig Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Daoyunai Energy Saving Technology Limited
*Subject:
*Message:
Characters Remaining: (0/3000)