Sign In | Join Free | My chinapackagenet.com
China Daoyunai Energy Saving Technology Limited logo
Daoyunai Energy Saving Technology Limited
Committed to underground pipeline CIPP and CCTV
Verified Supplier

4 Years

Home > UV Cured CIPP >

Zero Dig Trenchless Pipe Repair Equipment Large Diameter Municipal Sewer Rehab

Daoyunai Energy Saving Technology Limited
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Zero Dig Trenchless Pipe Repair Equipment Large Diameter Municipal Sewer Rehab

Brand Name : DAO

Model Number : D919

Place of Origin : Jiangsu, China

MOQ : 1 unit

Price : Variable

Payment Terms : T/T

Supply Ability : 20 units per month

Delivery Time : 20 working days

Packaging Details : Normal

Function : Large diameter sewer trenchless reha

Component : Blower, Cable, Video, Cure

Cable reel : 180 meters

Light : Mercury or LED

Diameter : DN650-1650

Color : Blank or printed

Contact Now

Large diameter municipal sewer trenchless No-Dig rehab by CIPP UV technology

Preparation of UV curing construction instructions:

The drainage pipeline is gravity flow. The upstream (the front section in the downstream direction) and downstream (the rear section in the downstream direction) of the pipeline shall be determined in advance, so as to determine the sequence of repairing dragging materials.

If the site space allows, it is suggested to drag the bottom film and materials in the following order: starting from the upstream direction and dragging along the downstream direction.

1. pretreatment:

Ventilation, water stop, pumping, dredging, and cleaning. Ensure that there is no ponding, water leakage, foreign matter, serious deformation or dislocation, and other defects inside the pipeline.

2. robot CCTV inspection to determine whether it can be repaired

3. pull the bottom film with a robot: (use braided rope, do not replace the rope at will, otherwise the material or membrane will rotate in the pipe)

The connection buckle between the rope head and the bottom membrane shall be firmly fastened, and another rope for pulling materials shall be put on the upper end of the bottom membrane (if a winch is used, it shall be a steel wire rope). During the membrane pulling process, ensure that the materials and ropes are not mixed with the rotation of the bottom membrane.

For long-distance materials with large pipe diameters, soapy water can be added to the bottom film to reduce the friction when the material is dragged.

UV Cure Trenchless Construction
Pipe diameter DN600-1200
Light source LED or Mercury is available
Temperature Two sensors for temperature monitoring
Leg Interchanged as needed.
Other features are available to be custom-made.

Zero Dig Trenchless Pipe Repair Equipment Large Diameter Municipal Sewer Rehab


Product Tags:

zero dig trenchless pipe repairs DAO

      

trenchless pipe repair equipments DAO

      

trenchless sewer repair

      
China Zero Dig Trenchless Pipe Repair Equipment Large Diameter Municipal Sewer Rehab wholesale

Zero Dig Trenchless Pipe Repair Equipment Large Diameter Municipal Sewer Rehab Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Daoyunai Energy Saving Technology Limited
*Subject:
*Message:
Characters Remaining: (0/3000)